
Production & QC
Inside a pre-shipment check: what we measure, sit on and photograph
A finished sofa is set up complete, measured against the drawing, sat on, and its seams, feet and paperwork photographed before anything is packed.
→

Production & QC
How an extending dining table is checked before it ships
Closed, it is a round table. Opened on the factory floor, it shows its slides, its folding leaf and whether the veneer matches across the joint.
→

Production & QC
How long does custom furniture from Foshan take? A 100-day schedule
One real schedule for an order to Sydney: 10 days to confirm, 60 to produce, 30 at sea. Each stage with its control point, owner and output document.
→
Other topics